We Dig Your Business

HomeAdvisor Screened Pro" class="sqs-block-button-element--medium sqs-button-element--primary sqs-block-button-element" > Kader Contruction has earned 3 seals of quality from HomeAdvisor/ Angi!!!!

Kader Construction has earned 3 Seals of Approval from HomeAdvisors/Angi!!!!!

Quality Seals

Kader Construction has earned 3 Seals of Approval from HomeAdvisor/Angi!!!

kaderconstruction

Kader Construction is a HomeAdvisor Top Rated Pro" class="sqs-block-button-element--medium sqs-button-element--primary sqs-block-button-element" > Make It

.

Kaderconstruction

HomeAdvisor Elite Pro - Kader Construction" class="sqs-block-button-element--medium sqs-button-element--primary sqs-block-button-element" > Make It

Skid Steer

Mini excavator

PC 18 Komatsu

Mini excavator

PC 18 Komatsu

Skid Steer

Backhoe

Volvo Backhoe

Make it
stand out.

Maybe you have a creative project to share with the world. Whatever it is, the way you tell your story online can make all the difference.

Driveway 3000 ft

12 ft wide

Video

Before

Excavate grade for build sit

in process

Before

After

Pond in progress

6 foot deep

After

pond is complete

After

Install fabric and rock

pond in progress

pond in progress

pond is complete

pond is complete

Drain pond to excavate

in progress

Land clearing

in progress

install 110 feet drain

Clear land

in progress

Clear land Building site

Introduce your brand

Clean land and prepare Building site

Introduce your brand

Clear land and prepare Building site

Before

In progress

Chipper trees

Land is clear

The Trees is remove

Land is clear

Trees is remove

After

Before

Edge of pond in process

After

Before

After

After

In Progress

French drain

In Progress

install French drain

Trailer

Before.

This is an image of the site before work.

Before..

After

Buried 5, 100 feet lines of drainage pipe from the homes gutters to woods edge.

After

Created new slope.

After Work...

I created a 6 feet level walking path from the edge of the deck and grated a gradual slope to the woods edge.

Before

Rain was flooding the basement of home.

A

fter

Built up the area around 3 sides of the house with top soil and created slope to provide proper drainage away from the house.

Install Driveway

Build up the driveway with DGA stone and created slope away from the home. I laid and buried pipe under the driveway for proper drainage for the gutters on the home.

Image Before Work

Create new access to the road and created a new 600 foot driveway to new home.

Remove Topsoil

Used D-5 bulldozer and prepared the area to lay new stone.

Ready to Receive Stone

In Progress

This is image install new 600 feet driveway.

After

Spread gravel and rolled flat.

After

In Progress


After

Install new gravel and leveled for for a business

After

install new gravel for Business

Install and spread gravel

Spread new gravel

Sink Hole Repair

Dig out old tank

Fill up the hole and compact

Before

Preparing area for retaining wall

In Progress

area is ready for french drain and pipe

In Progress

we are preparing area for retaining wall

Before

install drain

After

Drain installed

Before

area was flooding

In Progress

install French drain

In Progress

install French drain

Digging Trench

laying pipe use gravel #3 stone

In Progress

install drain#8 inch pipe

After

install drain and use Gravel #3 and seed

Before

Leveled and seeded

After

Finished leveling and seeding

After

driveway

After

Driveway

Before

need french drain and level up with topsoil

Before

Area that was flooding

After

Installed French drain and laid seed and straw

After

leveling and install french drain

After

Driveway

Before

install driveway

In Progress

install French drain and laid #3 stone

After

use #3 stone for basic

After

we use #3 stone for basic and finish grade with DGA

Gravel

Before

need Gravel

After

Finished job with DGA

After

DGA gravel

Before

need to level with topsoil

After

Level with topsoil and seed .

After

level with topsoil

After

level and seed

After

Level with topsoil and seed

Before

need to level and topsoil and seed

Before

need level and topsoil and seed

After

clean area and grade and level with topsoil and seed

After

clean area and grade .

level with topsoil .

seed

After

level

Befor

need to remove concrete and level to seed

Befor

Need to remove concrete and grade with top soil

After

level with top soil and seed lay straw

After

Level and seed

Before

need full up and grading with topsoil and seed

After

Finish grading with topsoil and ready to receive seed

After

seed and lay straw

Working on french drain

Prepare french drain

French drain

install french drain .

Who are we?

Kader Construction provides affordable precision earthmoving, excavating, ground de-watering, land-clearing, leveling and grading services to municipalities, businesses and individuals in the Greater Louisville/New Albany area. Using state-of-the art GPS technology, Kader Construction will complete your project quickly and accurately.

Services Available

 

It all begins with an idea. Can we help you accomplish your goal?

Get in Touch

Let us know about your project!